Journal abbreviation: Critical Path AIDS project

The abbreviation of the journal title "Critical Path AIDS project" is "Crit. Path AIDS Proj.". It is the recommended abbreviation to be used for abstracting, indexing and referencing purposes and meets all criteria of the ISO 4 standard for abbreviating names of scientific journals.

Abbreviation rules

The table below outlines in detail the ISO 4 rules and matches to the ISSN maintained list of title word abbreviations (TWA) to derive the abbreviation.

TitleAbbreviationWord/Stem/Rule
CriticalCrit.matches the stem "critica-"
PathPathNo abbreviation listed in TWA.
AIDSAIDSRule 4.4: Acronyms shall be retained in the abbreviated title.
projectProj.matches the stem "project-"

Abbreviation systems

ISO 4 abbreviation, as put forth by the International Organization for Standardization, is a method for creating standardized journal title abbreviations. This system ensures that journal titles are easily identifiable and referenced across various academic platforms.

Journal title abbreviations can be classified into ISO (International Organization for Standardization) for general disciplines, NLM (National Library of Medicine) for biomedical and life sciences, and CASSI (CAS Source Index) for chemistry and related fields.

About the journal

Full journal titleCritical Path AIDS project
AbbreviationCrit. Path AIDS Proj.
ISSN (print)1085-7605
ISSN (online)NA
NLM catalog9886098

Other journal abbreviations